Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84045 REL 6: 1990-055-00 EXP ID STEELHEAD M&E STUDIES
Project Number:
Title:
Idaho Salmon & Steelhead Monitoring and Evaluation Studies (M&E)
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
84045 REL 6
Contract Title:
1990-055-00 EXP ID STEELHEAD M&E STUDIES
Contract Continuation:
Previous: Next:
89381: 1990-055-00 EXP IDFG CHINOOK STEELHEAD M&E STUDIES FY 22
Contract Status:
Issued
Contract Description:
The purpose of the Idaho Salmon and Steelhead Monitoring and Evaluation Studies (ISSMES) is to monitor and evaluate the status and trends of wild Chinook Salmon and steelhead populations in Idaho. ISSMES is the central repository of information for wild Chinook Salmon and steelhead in Idaho. We will assess abundance, productivity, spatial structure, and diversity at the population and major population group scales. We will also assess abundance, productivity, and diversity at a broader scale based on samples from Lower Granite Dam. For Chinook Salmon this will encompass the Snake River spring/summer Chinook Evolutionarily Significant Unit (ESU) and distinct Genetic Stocks. And for steelhead this will encompass the Snake River Distinct Population Segment (DPS). To provide this scale of monitoring, ISSMES will sample adult and juvenile Chinook Salmon and steelhead at Lower Granite Dam. We will collaborate with the Lower Granite Dam Genetic Stock Identification project (2010-026-00) to break aggregate abundance estimates and age composition into major population groups and, in some cases, populations. Over time, productivity will be assessed. Intensive, high-precision (fish-in/fish-out) monitoring efforts will continue at select locations as will coordination and support of other intensive Chinook Salmon and steelhead monitoring work in Idaho.

At the population level, we will estimate adult abundance, length distribution, sex ratio, and age composition; smolt abundance, length structure, and age composition; survival of juveniles from spawning stream to Lower Granite Dam and smolt-to-adult return rate. Current extensive monitoring elements will also continue, including dispersed parr surveys to assess spatial structure, stream water temperature monitoring, as well as population-level genetic work. Genetic elements will emphasize maintenance of the genetic baseline used by project 2010-026-00 as well as estimating several measures of genetic diversity. Lastly, we will coordinate a multi-agency group to reconstruct the adult steelhead run into the Snake River basin. Project objectives are consistent with Snake River monitoring and evaluation goals, with the strategies put forth by the Snake River basin fish managers (Anadromous Salmonid Monitoring Strategy, ASMS), and with the guidance from NOAA Fisheries (Crawford and Rumsey 2009). Monitoring efforts for both species are funded using dedicated Idaho Fish Accord funds from BPA, as well as Idaho Power Company, Pacific Coast Salmon Recovery Funds, Pacific Salmon Treaty, Dingell-Johnson Sport Fish Restoration Program, and Lower Snake River Compensation Program.

The statement of work will be organized in accordance with the following objectives:

Objective 1 – Monitor status and trends of wild Chinook Salmon and steelhead at Lower Granite Dam.
Objective 2 – Conduct intensive, high-precision (fish-in/fish-out) monitoring of Chinook Salmon and steelhead in select populations.
Objective 3 – Conduct extensive juvenile Chinook Salmon and steelhead monitoring in selected streams through snorkel surveys and temperature monitoring.
Objective 4 – Monitor temporal and spatial genetic patterns of Chinook Salmon and steelhead populations in Idaho.
Objective 5 – Account for the spatial distribution and final disposition of all adult steelhead (hatchery and natural production) crossing Lower Granite Dam.
Objective 6 – Evaluate the life cycle survival and freshwater productivity of Snake River spring/summer Chinook Salmon and steelhead . There are two components: update/refine a stock-recruit model and estimate aggregate smolt-to-adult survival. This is an evaluation that puts together and interprets data generated from other objective in a form suitable for management evaluation.
Objective 7 – Coordinate reporting of Chinook Salmon redd counts in Idaho to fit the population format recommended by the Interior Columbia Basin Technical Recovery Team.
Account Type(s):
Expense
Contract Start Date:
01/01/2023
Contract End Date:
12/31/2023
Current Contract Value:
$3,847,738
Expenditures:
$3,847,738

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Daniel Affonso Bonneville Power Administration Yes Contracting Officer dxaffonso@bpa.gov (503) 230-5918
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Alexa Ballinger Idaho Department of Fish and Game (IDFG) Yes Interested Party alexa.ballinger@idfg.idaho.gov (208) 854-8920
Carli Baum Idaho Department of Fish and Game (IDFG) Yes Contract Manager carli.baum@idfg.idaho.gov (208) 854-8909
Nicolette Beeken Idaho Department of Fish and Game (IDFG) Yes Interested Party nicolette.beeken@idfg.idaho.gov (208) 854-8914
Gary Byrne Idaho Department of Fish and Game (IDFG) No Interested Party gary.byrne@idfg.idaho.gov (208) 287-2778
Matthew Campbell Idaho Department of Fish and Game (IDFG) Yes Interested Party matthew.campbell@idfg.idaho.gov (208) 939-6713
Luciano Chiaramonte Idaho Department of Fish and Game (IDFG) Yes Contract Manager luciano.chiaramonte@idfg.idaho.gov (208) 854-8906
Tim Copeland Idaho Department of Fish and Game (IDFG) Yes Supervisor tim.copeland@idfg.idaho.gov (208) 287-2782x232
Mike Edmondson Idaho Governor's Office of Species Conservation No Interested Party mike.edmondson@osc.idaho.gov (208) 334-2189
Lance Hebdon Idaho Department of Fish and Game (IDFG) Yes Interested Party lance.hebdon@idfg.idaho.gov (208) 287-2711
Amy Hines Idaho Governor's Office of Species Conservation No Interested Party amy.hines@osc.idaho.gov (208) 332-1557
Maureen Kavanagh Bonneville Power Administration Yes F&W Approver makavanagh@bpa.gov (503) 230-4272
Donavan Maude Idaho Department of Fish and Game (IDFG) No Contract Manager donavan.maude@idfg.idaho.gov (208) 854-8909
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Russell Scranton Bonneville Power Administration Yes COR rwscranton@bpa.gov (503) 230-4412
Susan Smith Idaho Department of Fish and Game (IDFG) No Administrative Contact susan.smith@idfg.idaho.gov (208) 287-2803


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation of management and timely contract administration B: 119. Manage project 12/31/2023 12/31/2023
Permits obtained to do field work C: 165. Project permitting 12/31/2023 12/31/2023
Completed Annual Report D: 132. Produce FINAL RM&E Technical Report for calendar year 2021 04/30/2023 06/28/2023
Completed Snake River Basin Steelhead 2021-2022 Run Reconstruction Report F: 141. Other Reports for BPA 12/31/2023
Produce accessible, error-checked datasets G: 157. IDFG Lower Granite Dam Juvenile Sampling for wild Chinook salmon and steelhead 05/31/2023 05/31/2023
Deliverable: An accessible, error-checked data set with metadata H: 162. IDFG Juvenile Age Composition of wild Chinook Salmon and steelhead from scales collected at Lower Granite Dam 12/31/2023 12/31/2023
Produce accessible, error-checked datasets I: 157. IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead 12/31/2023 12/31/2023
Deliverable: An adult Chinook Salmon and steelhead age composition dataset &metadata from LGR, IDFG weirs, hatchery traps and spawner surveys. J: 162. IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling 12/31/2023 12/31/2023
Produce accessible, error-checked datasets K: 157. IDFG Snorkel Surveys for Wild Chinook Salmon and Steelhead Parr in the Clearwater and Salmon River Basins. (Intensive, Core, Resident and Other Sample design) 12/31/2023 12/31/2023
Produce accessible, error-checked datasets L: 157. IDFG Snorkel Surveys for Wild Chinook Salmon and Steelhead Parr in the Clearwater and Salmon River Basins. (GTRS Extensive Sample design) 12/31/2023 12/31/2023
Deliverable: An accessible, error-checked data set with metadata M: 162. IDFG Parr Density and Distribution of wild Chinook Salmon and Steelhead from snorkel surveys. 04/30/2023 04/10/2023
Deliverable: I. A juvenile Chinook Salmon and steelhead dataset and metadata from fish collected at IDFG rotary screw traps. N: 157. IDFG Rotary Screw Trapping for wild Chinook Salmon and Steelhead emigrants in the Clearwater and Salmon River basins. 12/31/2023 12/31/2023
PIT-tagged juvenile Chinook Salmon and steelhead O: 158. IDFG PIT-Tagging of wild juvenile Chinook Salmon at rotary screw traps in the Clearwater and Salmon River basins. 11/30/2023 11/30/2023
PIT-tagged juvenile steelhead P: 158. IDFG PIT-Tagging of wild juvenile steelhead at rotary screw traps in the Clearwater and Salmon River basins. 11/30/2023 11/30/2023
PIT tag files available in PTAGIS Q: 159. Manage PIT tag files 11/30/2023 11/30/2023
An accessible, error-checked data set with metadata R: 162. IDFG Selected Population Performance Metrics for Chinook Salmon and Steelhead from Rotary Screw Trap Sampling 04/30/2023 06/30/2023
Produce accessible, error-checked datasets S: 157. IDFG Weir and Hatchery Trap Sampling for Wild Adult Spring/Summer Chinook Salmon and Steelhead. 12/31/2023 12/31/2023
Produce accessible, error-checked datasets T: 157. IDFG Ground based Redd Counts and Carcass Biological Sampling for Chinook Salmon in the Clearwater and Salmon River basins. 12/31/2023 12/31/2023
Produce accessible, error-checked datasets U: 157. IDFG Aerial Surveys for Chinook Salmon redds in the Middle Fork Salmon River basin. 12/31/2023 12/31/2023
Deliverable: An accessible, error-checked data set with metadata V: 162. IDFG Select Adult Snake River Spring/Summer Chinook Salmon Population Performance Metrics in Idaho 12/30/2023 12/31/2023
Produce accessible, error-checked datasets W: 157. IDFG PIT Array Operation and Maintenance 12/31/2023 12/31/2023
Deliverable: An accessible, error-checked data set with metadata X: 162. IDFG Run Reconstruction analysis of Snake River basin steelhead 2020-2021 data with co-managers 12/31/2023 12/31/2023
Produce accessible, error-checked datasets Y: 157. IDFG Stream Temperature data collection in the Clearwater and Salmon River basins. 12/31/2023 12/31/2023
Deliverable: An accessible, error-checked data set with metadata Z: 162. IDFG Stream Temperature Data Summarization for key wild Chinook Salmon and Steelhead streams in the Clearwater and Salmon River basins. 04/30/2023 04/30/2023
Share information on wild Chinook Salmon and steelhead in Idaho with internal & external customers AA: 161. Fulfill data requests and make professional presentations 12/31/2023 12/31/2023
Share IDFG Pacific Lamprey observations with regional partners. AB: 159. Coordinate IDFG Pacific Lamprey monitoring activities in Idaho 12/31/2023 12/31/2023
Completed building or facility AC: 201. Build Storage Facility for M&E Gear 12/30/2023 07/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 9 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 6 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 8 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 6 instances of WE 162 Analyze/Interpret Data
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Manage project
C 165 Project permitting
D 132 Produce FINAL RM&E Technical Report for calendar year 2021
E 132 Produce DRAFT RM&E Technical Report for calendar year 2022
F 141 Other Reports for BPA
G 157 IDFG Lower Granite Dam Juvenile Sampling for wild Chinook salmon and steelhead 01/01/2023
H 162 IDFG Juvenile Age Composition of wild Chinook Salmon and steelhead from scales collected at Lower Granite Dam
I 157 IDFG Lower Granite Dam Adult Sampling for wild spring/summer Chinook Salmon and Steelhead 01/01/2023
J 162 IDFG Population Performance Metrics of Wild Adult Chinook Salmon and Steelhead from Lower Granite Dam Sampling
K 157 IDFG Snorkel Surveys for Wild Chinook Salmon and Steelhead Parr in the Clearwater and Salmon River Basins. (Intensive, Core, Resident and Other Sample design) 01/01/2023
L 157 IDFG Snorkel Surveys for Wild Chinook Salmon and Steelhead Parr in the Clearwater and Salmon River Basins. (GTRS Extensive Sample design) 01/01/2023
M 162 IDFG Parr Density and Distribution of wild Chinook Salmon and Steelhead from snorkel surveys.
N 157 IDFG Rotary Screw Trapping for wild Chinook Salmon and Steelhead emigrants in the Clearwater and Salmon River basins. 01/01/2023
O 158 IDFG PIT-Tagging of wild juvenile Chinook Salmon at rotary screw traps in the Clearwater and Salmon River basins. 01/01/2023
P 158 IDFG PIT-Tagging of wild juvenile steelhead at rotary screw traps in the Clearwater and Salmon River basins. 01/01/2023
Q 159 Manage PIT tag files
R 162 IDFG Selected Population Performance Metrics for Chinook Salmon and Steelhead from Rotary Screw Trap Sampling
S 157 IDFG Weir and Hatchery Trap Sampling for Wild Adult Spring/Summer Chinook Salmon and Steelhead. 01/01/2023
T 157 IDFG Ground based Redd Counts and Carcass Biological Sampling for Chinook Salmon in the Clearwater and Salmon River basins. 01/01/2023
U 157 IDFG Aerial Surveys for Chinook Salmon redds in the Middle Fork Salmon River basin. 01/01/2023
V 162 IDFG Select Adult Snake River Spring/Summer Chinook Salmon Population Performance Metrics in Idaho
W 157 IDFG PIT Array Operation and Maintenance 01/01/2023
X 162 IDFG Run Reconstruction analysis of Snake River basin steelhead 2020-2021 data with co-managers
Y 157 IDFG Stream Temperature data collection in the Clearwater and Salmon River basins. 01/01/2023
Z 162 IDFG Stream Temperature Data Summarization for key wild Chinook Salmon and Steelhead streams in the Clearwater and Salmon River basins.
AA 161 Fulfill data requests and make professional presentations
AB 159 Coordinate IDFG Pacific Lamprey monitoring activities in Idaho
AC 201 Build Storage Facility for M&E Gear 06/20/2023